REV.11- 8 - 10 ARRAY RESILIENT INSTALLATION GUIDE Note: This Guide supercedes all printed technical materi
REV.1 1 - 8 - 10 9 INSTALLATION FOR PLANK Layout of the Room: Find the center point of the room. Strike a line. Obtain a true 90’
REV.1 1 - 8 - 10 10 TROUBLE SHOOTING TIPS Occasionally, problems can arise during
REV.1 1 - 8 - 10 11 Problem: Product is well bonded in some areas but not in others: Causes: • Since adhesives do not fail selectively, you m
REV.1 1 - 8 - 10 12 Problem: Adhesive becoming “wet” or “gummy” some time after installation; Causes: • Moisture present in subfloor • Old cu
REV.11- 8 - 10 1 INSTALLATION GUIDE TABLE OF CONTENTS PAGES
REV.1 1 - 8 - 10 2 INSTALLATION, SUBFLOOR AND UNDERLAYMENT REQUIREMENTS Approved subfloors: a. Concrete: The concrete must be free of any curing
REV.1 1 - 8 - 10 3 installation and remain off for at least 6 days after installation to allow the adhesive to fully cure. Maximum operating temperat
REV.1 1 - 8 - 10 4 SUBFLOOR PREPARATION In general, all substrates must be free of contaminants such as dirt, weak concrete, grease, wax, oil, sealer
REV.1 1 - 8 - 10 5 Sealers: Shaw does not endorse any concrete or floor sealers against moisture. IF MOISTURE IS PRESENT, DO NOT INSTALL FLOOR. Some
REV.1 1 - 8 - 10 6 Bond Test: To determine if a subfloor is compatible to Shaw adhesives, or to determine if the porous or non-porous adhesive applic
REV.1 1 - 8 - 10 7 INSTALLATION FOR TILE Layout of the Room for Squarely Laid Fields To square the area to be covered, f
REV.1 1 - 8 - 10 8 Array-Grout □ Stain Resistance □ Premixed □ No Shading □ Resists mold and mildew Coverage: Joint Width Covera
Kommentare zu diesen Handbüchern